• 20140925_145855
  • 20140925_145908
  • 20140904_184909
  • 20140925_145920
  • 20140925_150107
  • 20140616_132355
  • 20140616_132403
  • 20140618_083217
  • 20140618_083225
  • 20140618_083236
  • 20140618_083251
  • 20140618_083257
  • 20140618_083309
  • 20140627_151528
  • 20140627_151607
  • 20140628_094015
  • 20140628_094020
  • 20140628_120336
  • 20140628_120339
  • 20140628_120345
  • 20140628_120406
  • 20140628_124624
  • 20140628_150242
  • 20140628_120406
  • 20140628_124624
  • 20140628_124636
  • 20140628_124651
  • 20140628_150242
  • 20140628_150255
  • 20140702_161639
  • 20140702_161647
  • 20140702_161653
  • 20140703_095600
  • 20140704_115235
  • 20140704_115251
  • 20140718_144911
  • 20140718_144922
  • 20140718_144954
  • 20140718_145006
  • 20140718_145012
  • 20140718_145036
  • 20140819_085017
  • 20140819_161711
  • 20140819_161723
  • 20140820_120109
  • 20140820_120121
  • 20140820_120132
  • 20140904_184814
  • 20140417_091912
  • 20140417_091930
  • 20140417_091946
  • 20131007_164750
  • 20140818_155644
  • 20140830_132402
  • 20140904_184903
  • 20140925_131300
  • 20140925_131241
  • 20140925_131300
  • 20140925_145827

Kitchen, Joinery Work, Radcliffe-on-Trent, Nottingham.

This is a brand new 5 bedroom house in Radcliffe-on-Trent in which we did all the first and second fix Joinery.

20140417_091912 20140417_091930 20140417_091946

 

This work included all stud work, staircase, kitchen, doors, door frames, skirting and architraves and window boards.

20140618_083217 20140618_083225 20140618_083236 20140618_083257 20140618_083309

This is the Stud Work upstairs, this involved getting all the bedroom dimensions correct.

20140618_083251 20140616_132403 20140718_144954 20140616_132355

 

All the insulation and window boards went in next. We also boxed all steelwork in.

20140627_151528 20140628_094015 20140628_120336 20140628_120406 20140702_161647

We made and fitted the staircase. This meant all first fix joinery was complete and ready for plastering.

20140718_145036 20140718_145012 20140718_145006 20140718_144922

All the skirting and architrave was then fitted.

20140925_145908 20140925_150107 20140925_145827 20140925_145855 20140904_18490320140904_184814

All the second fix joinery was then completed including the Oak handrail to the staircase, Oak doors and brand new ironmongery.

20140819_161711 20140819_085017 20140820_120109 20140925_131300 20140925_131241

And finally the kitchen was completed.

Related Entries